India Must Look Beyond Port Capacity To Build Globally Connected Trade Gateways: FICCI–Kearney
Mumbai:
Port Wings News Network:
India’s ports have grown busier and more efficient over the past decade, but gaps in inland connectivity, logistics coordination and shipping services could limit the benefits of this progress, according to a report released by FICCI and Kearney in Mumbai.
India’s Maritime Agenda for 2030: From efficient ports to globally connected trade gateways argues that the next phase of maritime growth will be decided less by berths and cranes than by the shipping services, inland links, logistics and industry that connect ports to markets. It calls on government and industry to develop differentiated strategies by 2030 for four types of gateway: container gateways, transshipment hubs, industrial and energy gateways, and specialised export corridors.
The case rests on a decade of progress. Cargo handled at India’s major and non-major ports rose 38 per cent between FY2017–18 and FY2025–26, from 1,209 million tonnes to 1,668 million tonnes, while handling capacity grew 22 per cent to 2.8 billion tonnes a year. Utilisation has climbed from 52 per cent to 59 per cent, leaving the system with considerable headroom.
Average vessel turnaround at major ports has fallen 18 per cent to about 49 hours, and Jawaharlal Nehru Port Authority (JNPA), Pipavav and Mundra all rank among the top 30 in the World Bank’s Container Port Performance Index 2025.
The delays now lie elsewhere. At the four core seaports covered by the 2025 National Time Release Study, export approval took about 30 hours on average, but the interval between approval and vessel departure stretched to about 158 hours, or 84 per cent of total measured time. At Jawaharlal Nehru Custom House, customs clearance for exports averaged 2 hours 12 minutes in 2026, yet the full export cycle exceeded eight days. The report cautions that this reflects logistics activity and scheduled waiting, not only avoidable delay, but says it shows where coordination matters most.
Transshipment is a second weakness. About 75 per cent of India’s transshipment containers were handled at overseas ports as of May 2025. The commissioning of Vizhinjam that month added deepwater domestic capacity, but subsequent shifts in shipping-line rotations show how hard hub status is to secure.
Private participation has expanded under the Major Port Authorities Act 2021, with privately run terminals handling about two-thirds of major-port cargo, against a government target of 85 per cent by 2030. Inland, 84 of the 294 road and rail projects identified to link ports with their hinterlands had been completed by July 2026, and the 1,506-km Western Dedicated Freight Corridor connecting JNPA with Dadri was fully commissioned in March 2026.
Drawing on the experience of Shanghai–Ningbo, Rotterdam, Jebel Ali and Singapore, the report assesses Indian gateways against six pillars, ranging from berth productivity and liner services to industrial clusters and digital border systems.
Its recommendations to government are threefold. The Ministry of Ports, Shipping and Waterways and state governments should define the cargo, industrial catchments and overseas markets each priority gateway will serve, and align investment with demonstrated demand. Road and rail links should be prioritised around actual cargo flows, jointly with the railways and road transport ministries. And shipment data and time-release studies should be used to identify where cargo spends time, and why.
The report also proposes a designated coordinator for each gateway, with every intervention assigned an owner, a funding route and a milestone, and performance tracked on total shipment cost, transit reliability, market access, cargo growth and commercial returns.











